Спабо за мнения,
буду дальше искать.
Я переделала резюме.
SUMMARY
Talented SCADA and automation control engineer with more than 6 years of experience in Industrial Automation and integrated systems, technical support, automation software design and development. Contributed to technology growth in development by promoting innovation, stability, optimization in production. Broad based background encompasses exceptional efficiency in architecture, problem resolution for new and existing systems for Chemical industries, Gas & Oil industries.
SKILLS
Professional: HMI/SCADA development/programming Industrial Automation and Control systems development, Optimization, PID control and tuning, System Integration, Field installation, Testing, Start-up and support, problem solving and troubleshooting, Network operations.
Technologies: Wonderware Intouch, RSView32, Genesis32 Iconics, Mathworks Matlab, Visio, MS Visual Studio, MySQL.
Familiar with other technologies: RSLogix500, 5000, PLC, C++
Industrial Networks and Communications: DH485, Modbus, Ethernet TCP/IP, Controlnet, DH+, RS232, OPC Standard, Wireless.
EXPERIENCE
June. 2009 – June. 2012 Ufa State aviation Technical University: Automation engineer. (формально я числилась, т.е не вранье уж совсем)
As a part of team developed Optimal digital control system for industreal equipment for PLC. Responsibilities: Designed mathematical models of the petroleum pump with VFD in Matlab, Fortran. Developed optimal methods of PID control tuning using mathematical methods of optimization for digital controllers. Obtained patents. Wrote articles and reports.
June. 2005 – June. 2011 "Company name": SCADA engineer.
Developed 4 large projects up to 5000 tags for oil and gas companies. Responsibilities: Developed and deployed customized software from sketch (Wonderware InTouch, Genesis32). Created visualization: diagrams and schematic drawings for various types of equipment (pumps, valves, tanks), fire and gas alarms, alarm and event journals, historical trends, one-three-line diagrams, control panels, SCADA point lists. The handled variables included parameters as Current, Vibration, Temperature, Levels, Pressure, Flow, and Frequency. Configured secure access to applications for different type of users. Defined OPC Servers. Met multiple deadlines in fast placed environment while meeting construction schedules. Performed installation on project site. Installed Windows for several workstations. Designed networks configurations, and administrations in TCP based networks (LAN/WAN), serial point-to-point communication, and multi-drop networks, cyber security requirements. Organized data transferring to 3rd party and remote control. Integrating with 3rd party applications. Performed Testing and troubleshooting of the integrated system. Configured Raid server and data gathering. Developed secure automatic load of the integrated system. Established the manuals, instructed the staff. Updated, restructured and expanded various of existing systems. Established the remodeled system specification, utility standard documentation and data flow diagrams (Visio). Impacted in the project scope.
EDUCATION
Sept. 2001 – Jul. 2006 Masters in CS: Automated Systems of Data Processing and Control. Ufa State Aviation Technical University, Russia.
TEFL score 83 points.